Recently we were commissioned to document the installation of a two lane bridge in Walker, Arizona. What a great couple of days working alongside the men of Capital Improvements who do this type of work day in day out. The adrenaline started to ramp up every time one of the eight eighty foot concrete beams rolled into place by semi. Working as one the construction and engineering crews loosened the turnbuckles and attached the steel cables from a 350 ton Maxim Crane. Slowly the crane lifted the beam off its resting plates and suspends it enough to see if the load is distributed correctly. The green light is given to swing the beams over to the bridge area. Small crews wrangle the beams between the power poles and trees surrounding Lynx Creek. Its a tight squeeze but all of the beams are lowered into place over a two day period. The first days shoot consisted of a more editorial run and gun documentation style of shooting trying to get as many different angles of shots possible. The second day I took advantage of shooting from a Monfrotto tripod as well as utilizing a Tilt and Shift lens. I employed shooting series of images to composite in post. This helps maintain the detail of the files and allows for extremely huge enlargements.
Photography Journal
Aspen Glow
One of the many splendors of living in Arizona is the Aspen Glow. Anywhere around the state fall in Flagstaff brings brilliant colors and late autumn into winter wet cool days. If you are new Read more…
0 Comments